Fallout Wiki
Advertisement
Fallout Wiki

Poseidon Energy Plant WV-06 terminal entries are a series of entries found on terminals at Poseidon Energy Plant WV-06 in Fallout 76.

Protest camp terminal[]

Note: This desk terminal is located on the picnic tables inside the protest camp just outside the power plant grounds.

Transcript

Welcome to ROBCO Industries (TM) Termlink
AMU Steward - Jacob Hargraves

Renee[]

Transcript

The gas. They gassed us, Renee. It's doing something to everyone. I can feel it. It's like adrenaline is pumping into my body and won't stop. I just saw Cindy and Foster leap onto a soldier and tear his face in half.

I'm sorry, Renee. I have to stop whatever it is this gas is doing to me. I hope you're safe in there. I love you.

- Jacob

Associated Miner's Unions[]

Transcript

The Associated Miner's Union's goals are simple. Ultracite has given this plant a new lease on life, and that good fortune should be spread to Poseidon Energy's loyal employees.

Automating away all our jobs is more than just sowing discontent, it's bad for business to throw away all our collective years of experience. The whole of Appalachia can't produce energy without people, no matter what the robot manufacturers say to the contrary.

Access control terminal[]

Note: These wall terminals are next to the MagLock doors to the transformer yard inside the turbine hall, the roof access from the plan offices. To the turbine hall from the transformer yard. They require Hacker level 3 to access or the Poseidon plant access codes.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Access Control

Transcript

---- SECURITY STATUS ----
Facility Lockdown: ACTIVE
Reactor Lockdown: ACTIVE

Override Facility Lockdown[]

Transcript

Accessing MaxLock Security Suite...

Transcript

Verifying credentials... done.
Initiating local override... done.
Releasing MagLocks... done.

Security locks on nearby doors have been temporarily released. The facility lockdown remains in place and may only be disabled from the central security office.

Receptionist's terminal[]

Note: This desk terminal is located in the receptionists kiosk in the lobby. It is a level 0 locked terminal.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Reception

Visitor Questions[]

Transcript

If any approved visitors ask, feel free to tell them about the history of this power plant. Yes, it was originally built in the 1970s, so some of the halls and equipment looks a bit dated. But the retrofits to make it operational again are one hundred percent safe, in addition to being cost effective.

Protests Outside[]

Transcript

Reminded to inform security of any and all visitors from outside. One of the protestors made it into the building and shouted slogans at one of the executives. We need to keep this building contained for as long as the tents are out there.

Safe Control[]

Note: Accessing this command unlocks the safe behind the terminal. It requires Picklock level 1 to access.

Turret Control[]

Plant manager's terminal[]

Note: This desk terminal is located on the wood desk inside the plant manager's office. It requires Hacker level 0 to access without the Poseidon plant manager's password.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Renee Hargraves

Jacob[]

Transcript

I'm locked in, Jacob. I can't get out. I saw everything that happened through the window. The gas. The protestors going crazy. You...

I'm sorry, Jacob. I couldn't stop them. I love you. We'll be together soon.

-Renee

Transcript: Manager's Recording[]

Transcript

Renee: I can't believe this. My god, Brent, those are our employees out there!

Brent: Not anymore. You saw the policy. Every last one of them was fired the moment they stepped out onto that picket line. And good riddance.

Renee: You didn't have to call in the military!

Renee: We should have negotiated with them. They just want a new contract. A little job security. Is that too much to ask?

Brent: We don't need to negotiate. We don't need them at all. The new robots will be here on Monday.

Renee: What? Why wasn't I told about this?

Brent: Why? So you could slip the news to the union? Don't think we don't know. Sympathizer.

Renee: That's enough. You're fired. Get the hell out of my plant.

Brent: No. No, Renee. I don't think so.

Brent: As Director of Security, I've already declared a state of emergency. This entire facility is now under a Class-III lockdown.

Brent: Until this situation has been resolved, I'm afraid that means I'm in charge here.

Renee: What?

Brent: Kyle!

Kyle: Sir.

Brent: See that Ms. Hargraves is kept safe in her office until we've dealt with the protestors.

Kyle: Sir.

Renee: No! No, Brent, you can't do this!

Renee: Grah... Let me go! Brent! Brent!

Safe Control[]

Note: Accessing this command unlocks the wall safe next to the terminal. It requires Picklock level 1 to access.

Decontamination control terminal[]

Note: This desk terminal is located on a counter inside the security office.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Decontamination

Protest Security Plan[]

Transcript

Brent's asking for us to call in the military on this one. Seems like we're bypassing a few steps here. A few tents on our lawn is hardly a national security issue.

It's that Ultracite. Ever since the plant started back up by using that stuff, it's been nothing but government suits in here.

Plant Manager's Office[]

Transcript

We've locked Renee in her office. Brent says she's a union sympathizer, and he doesn't want her interfering once the military starts shooting off all that gas.

Decontamination Arch Control[]

Transcript

Automated Decontamination Arch

STATUS: INACTIVE
FIRMWARE BUILD: 1.4.6
MIST RESERVOIRE: OK
NOZZLE CONTROL: OK

Activate Decontamination Arches[]

Transcript

Pressurizing Decontamination Mist... done.
Activating Nozzles... done.

The Decontamination System is now active.

Transcript

> Accessing Control System...

Plant security terminal[]

Note: This console terminal is located in the security office.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Plant Security

Note: This is the default.

Transcript

Security Status:
Facility Lockdown: ACTIVE
Reactor Lockdown: ACTIVE

Note: This is the display after disengaging both the lockdowns.

Transcript

Security Status:
Facility Lockdown: INACTIVE
Reactor Lockdown: INACTIVE

Issue Security Credentials[]

Transcript

Accessing user database... done.
Authorizing new user... done.
Issuing security credentials... done.

END Facility Lockdown[]

Transcript

Verifying credentials... done.
Terminating Facility Lockdown... done.
Opening all security doors... done.

The lockdown protocol has been terminated.

END Reactor Lockdown[]

Transcript

Verifying credentials... done.
Terminating Reactor Lockdown... done.
Opening all security doors... done.

The lockdown protocol has been terminated.

BEGIN Facility Lockdown[]

BEGIN Reactor Lockdown[]

Fuel storage room terminal[]

Note: This console terminal is located in the control niche at the top of the fuel storage room. It is locked and requires Hacker level 0 to access.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Fuel Storage

Ultracite Storage[]

Transcript

Ultracite might be new, but radioactivity isn't. Use all the Uranium procedures for this stuff. Everyone in suits. Everyone.

Government Inspection[]

Transcript

Another round of inspections coming up. I've never seen so many federal agents in one place. They always look at us like we're doing something wrong.

Safe Control[]

Note: Accessing this command unlocks the wall safe on the opposite side of the room. It is locked and requires Picklock level 1 to access.

Hazmat storage room terminal[]

Note: This desk terminal is located on the desk in the storage room office in the basement.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Hazmat Storage

Archives Deleted[]

Transcript

Terminal archives have been deleted due to remote factory reset.

Poseidon plant master control terminal[]

Note: This console terminal is located inside the control room.

Transcript

      --}---- Welcome to PoseidoNet ----{--

Transcript

=====================================================
|       Poseidon Power Management System            |
|          Poseidon Energy Plant WV-06              |
=====================================================
POWER PLANT: Poseidon Energy Plant WV-06
STATUS: ***SYSTEM FAILURE***
REACTOR SYSTEM STATUS: 5% - FAIL
GENERATOR SYSTEM STATUS: 100%
COOLING SYSTEM STATUS: 5% - FAIL
=====================================================

About your Power Management System[]

Transcript

Poseidon Power Management System
v.18.2.101.4

INTRODUCTION
Welcome to the Poseidon Power Management System, developed by Poseidon Energy, the world leader in energy technology. PPMS is a fully automated power management solution, capable of monitoring and maintaining a modern nuclear power plant and its distribution network with minimal human oversight.

POWER PLANT MANAGEMENT
Dedicated PPMS Modules are responsible for controlling each of your plant's key subsytems: its Reactor, Generators, and Cooling Towers. In the event of critical failure in any of these systems, PPMS will initiate a controlled shutdown of the plant, which will remain offline until all systems have been sufficiently repaired to allow the plant to be restarted safely.

POWER DISTRIBUTION MANAGEMENT
The PPMS Power Distribution Module conducts real-time demand monitoring, automatically recalibrating power generation to meet end-user needs without surges, brownouts, or the need for expensive load-balancing systems.

MORE DETAILS
Consult your operations manual for

LEGAL NOTICE
Poseidon Energy and/or its subsidiaries are not responsible for any loss or damage resulting from the use of PPMS. On-site human operators and maintainenceIn-game spelling, punctuation and/or grammar personnel required by law.

Transcript

> Loading File...

Restart Power Plant[]

Note: This entry is displayed if the power plant is not yet sufficiently repaired.

Transcript

Verifying Subsystem Integrity...
...FAIL.

ERROR 144:
One or more plant subsystems has failed. All subsystems must be operational in order to initiate the restart process. Please repair the indicated subsytem(s).

For more information, consult the About page or your operations manual.

Note: This entry is displayed if the power plant is sufficiently repaired.

Transcript

Verifying Subsystem Integrity...
...done.
Accessing Reactor Control Interlink...
...done.
Calibrating Reactor Control Rods...
...done.
Rebalancing Generator and Cooling Systems...
...done.

Restart complete. All systems nominal. Poseidon Energy Plant WV-06 is now operating at full capacity.

Turbine hall terminal[]

Note: This desk terminal is located on a desk inside a control niche inside the turbine hall.

Transcript

Welcome to ROBCO Industries (TM) Termlink
Poseidon Energy Plant WV-06 - Turbine Hall

Turbines[]

Transcript

The turbines are what's actually generating all the power. Everything else is just fancy fuel to keep it spinning, so don't slack on the inspections or maintenance.

Ultracite Retrofit[]

Transcript

These old coal plant machines sure don't look shiny, but they've made it through our retrofit, no problems. We'll get this whole place burning Ultracite and squeezing out the juice ahead of schedule.

Turret Control[]

Terminal[]

Note: This desk terminal is located on the broken metal shelves inside the southern expansion. It is locked and requires Hacker level 2.

Transcript

Welcome to ROBCO Industries (TM) Termlink

Remote Door Control[]

Advertisement