Fallout Wiki
Advertisement
Fallout Wiki

The Wind farm maintenance terminal entries are entries found on four terminals within the Wind farm maintenance in the Fallout 4 add-on Far Harbor.

Facility terminal[]

Transcript

VERDANT-AIR WIND POWER
A Division of GDA Fusion
[ACTIVE USER]: Rydecker, K.

{Messages}__________________________________

[8/14/77 - Remember Why You're There][]

Transcript

TO: Rydekcer, K
FROM: Browne, Julius (VP, Marketing & PR)
DATE: 8/14/77
______________________________________
While your efforts to further the viability of this wind power experimentare In-game spelling, punctuation and/or grammar admirable, Dr. Rydecker, we don't want you losing focus on why exactly GDA is funding this project.

You're up there to make us look good to all the US senators and representatives vacationing in the great state of Maine and not like a company baselessly accused of poisoning their constituents' groundwater.

We're in the fusion business, Kelly, so just file your reports, collect your paycheck, and enjoy the fact you're living on a resort island on our dime.

[9/22/77 - No Need for Hostility][]

Transcript

TO: Rydekcer, K
FROM: Browne, Julius (VP, Marketing & PR)
DATE: 9/22/77
______________________________________
There's no need to get hostile, Doc. We're partners in this, remember? I ran your report up the chain like you asked, and it generated as much interest as I told you it would.

"Perpetually sustainable power" isn't a phrase that gets people excited around here. So unless you can figure out how your self-proclaimed "breakthrough" can be made to sell more household fusion generators, I'd just lay off. I'm trying to help you, Kelly.

[10/17/77 - Got What You Wanted][]

Transcript

TO: Rydekcer, K
FROM: Browne, Julius (VP, Marketing & PR)
DATE: 10/17/77
______________________________________
You wanted attention from corporate? Well, you're getting it.

Your team has two weeks to wrap up whatever they're doing before we begin dismantling the plant. The board members read the report you sent them behind my back and decided it was against GDA's best interest to spend money on a possible rival technology. This could've been so easy, Doc, but you had to mess it up.

There was one last thing I need to say, though. Please take the time to remind your team of the non-disclosure agreements they all signed. Those are perpetually binding.

Turbine 001 regulator terminal[]

Transcript

-------------------------------------------------
[Turbine_001 STATUS] - ACTIVE
[GRID CONNECTION] - MDI_06XX_AUXILIARY
Please select a command:
-------------------------------------------------

View Windmill Status[]

Transcript

TURBINE_DATA______________________________________
- Power Level: 84%
- Circuit Integrity: 81%
- Current Rotational Threshold: 15 rpm
SYTEM_DATA________________________________________
- Most Recent User Log-In: <DELETED>
__________________________________________________

Access System Files[]

Transcript

__________________________________________________
<ACCESS DENIED>
<REMOTE SYSTEM LOCKDOWN ACTIVE>

<AUTHORIZED USER CREDENTIALS REQUIRED>

Turbine 002 regulator terminal[]

Transcript

-------------------------------------------------
[Turbine_002 STATUS] - ACTIVE
[GRID CONNECTION] - MDI_0711_ACADIA
Please select a command:
-------------------------------------------------

View Windmill Status[]

Transcript

TURBINE_DATA______________________________________
- Power Level: 91%
- Circuit Integrity: 82%
- Current Rotational Threshold: 19 rpm
SYTEM_DATA________________________________________
- Most Recent User Log-In: <DELETED>
__________________________________________________

Access System Files[]

Transcript

__________________________________________________
<ACCESS DENIED>
<REMOTE SYSTEM LOCKDOWN ACTIVE>

<AUTHORIZED USER CREDENTIALS REQUIRED>

Turbine 003 regulator terminal[]

Transcript

-------------------------------------------------
[Turbine_003 STATUS] - ACTIVE
[GRID CONNECTION] - MDI_0161_FAR_HARBOR>
Please select a command:
-------------------------------------------------

View Windmill Status[]

Transcript

TURBINE_DATA______________________________________
- Power Level: 88%
- Circuit Integrity: 79%
- Current Rotational Threshold: 18 rpm
SYTEM_DATA________________________________________
- Most Recent User Log-In: <DELETED>
__________________________________________________

Access System Files[]

Transcript

__________________________________________________
<ACCESS DENIED>
<REMOTE SYSTEM LOCKDOWN ACTIVE>

<AUTHORIZED USER CREDENTIALS REQUIRED>

[RUN:// ") % T 3 M p e $ t {"][]

Transcript

System override ini@t3d.........................
0RRIDE K[]MMMMMPl...............................
SYS3MM C{[[[{[]}}]].............................
C0NT4KT @DM!N...................................
ASDAJlkHALK(&(A*S&DuIAsjAsd087AO................
AS)(UijOIAWJE$o9uasudujA9posdi..................
AW)UIASJHDOAJH09ouw049uAw0iADS..................
OAUWE)ujoiJAsi9u(@Ue3ujAOA)S(i09u...............
)(*@)#*)*U-032=-092-AWjm........................
)(*@)#UIJPJ(u8@*#@9+!_..........................
JB@K#&)(*U!)#*__@)#_JJNM:KHM....................
NK90_)##[]3434[]bfGH.....................[][][][
[][][][][][][][][][][][][][][][][][][][][][][][]
[][][][][][][][][][][][][][][][][][][][][][][][]
[][][][][][][][][][][][][][][][][][][][][][][][]
[][][][][][][][][][][][][][][][][][][][][][][][]

Advertisement